Heijunka (Load Leveling) is a Japanese term for leveling the production schedule over an interval of time in order to achieve smooth flow and be better synchronized with the actual customer demand.
A basic aspect of Heijunka is the “interval” over which you level production: Every Product Every Interval (EPEI). The interval itself can be a month, a week, a day, a shift, or even small increments of time. Heijunka eliminates muda (waste), mura (unevenness), and muri (unreasonableness) to achieve smooth flow.
A Heijunka Box is actually a simple schedule board that shows the planned production of every part every interval.
CITEC’s Lean experts will work with you to identify opportunities to use Level Production – train your employees on the core elements and work with them to implement.
Benefits to your organization:
[click to contact us] [click for current training]
Additional topics you might find interesting: